This semi-automatic plant is an ideal system for semi-automatic electroplating setup. Here the components to be processed are hung on conductive hooks system which move at a configurable conveyor speed. The conveyor can be set based on the process timings.
The conveyor chain and supporting system are made from stainless steel to restrict corrosion for prolonged life and the distance between anodes and cathodes (components) is always constant. Material of construction of tank is usually polypropylene and that of anode basket is Titanium. A precise and controlled current is provided on the copper track on which these copper hooks move. An added advantage of these type of plants is that the Loading and Unloading of the components are at the same point.
A centralized control panel is employed to displays conveyor speed with an installed VFD, current and temperatures of various electrolytes.
Ability to handle various finishes with a range
of components in the same plant.
Contemporary Material Handling System
Enhanced GROWEL Automation Features
Extremely Maintenance friendly Design
Integrated PLC controlled Fume
Extraction System
Designed to optimize Water Consumption
The plating and transfer of all components is simultaneous. The plant has an indexed fixed cycle time except for long components which travel submerged within the tank. DC current is passed in the electrolytic process with the help of a copper strip provided on tanks & a copper current collector provided on each work-arm.
Description
Specification
Plating Window LxWxH (mm)
600x400x1000
Cycle Time (seconds)
45 to 60
Load Per Hanger (Kg)
5
Number of operators
One or Two
Automation is greatly preferred in bulk plating operations, predominantly for the following reasons:
Automation Features:
Data Logging (SCADA) is an integral part of automation and has become a necessary tool for all plating plants. Growel’s sophisticated SCADA system with enhanced features are supplied with all its surface finishing plants. Data Logging Helps in:
Fume exhaust system
Dosing system
Metal recovery system
Effluent Treatment Plant
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |